Interreg VI news
By conducting an extensive study on the accessibility of the EUREGIO region by air transport, this project answered the question of how regional players should position themselves vis-a-vis relevant airports within and outside the region. In order to do so, air-related mobility needs within the EUREGIO were studied as well as the internal (by land) and external (by air) accessibility of 13 relevant airports. This has be done for the status quo as well as several future scenarios.
The results are publicly available in the form of a final report and three annex reports on the EUREGIO homepage. In addition, a summary brochure was prepared and handed out to stakeholders.
In addition to strengthening cross-border cooperation when it comes to air transport issues, both politicians and their administrative support bodies are provided with the well-founded insights in order to take strategic decisions to ensure the long term international accessibility by air of the EUREGIO region.
346.087,59 €
1.1.2018 - 31.7.2019
Socio-cultural and territorial cohesion in the programme area
EUREGIO
Kreis Warendorf, Kreis Steinfurt, Kreis Borken, Landkreis Emsland, Regio Twente, Regio Achterhoek, Partner Provincie Overijssel, Landkreis Grafschaft Bentheim, Stadt Osnabrück, Partner Provincie Gelderland, Partner Provincie Flevoland, Stadt Münster, Kreis Coesfeld, Landkreis Osnabrück, Gemeente Coevorden,
Financer | Amount |
---|---|
Partner Provincie Gelderland | 0,00 € |
Kreis Coesfeld | 3.721,28 € |
Provincie Flevoland | 17.303,97 € |
Kreis Steinfurt | 3.721,28 € |
MWIDE NRW | 25.955,97 € |
Landkreis Grafschaft Bentheim | 3.721,28 € |
Partner Provincie Flevoland | 7.101,45 € |
Landkreis Emsland | 3.721,28 € |
MB Niedersachsen | 25.955,97 € |
EFRE / EFRO | 173.043,80 € |
Gemeente Coevorden | 930,32 € |
Landkreis Osnabrück | 3.721,28 € |
Stadt Münster | 3.721,28 € |
EUREGIO | 2.795,01 € |
Regio Twente | 5.349,35 € |
Provincie Gelderland | 24.405,42 € |
Stadt Osnabrück | 3.721,28 € |
Kreis Borken | 3.721,28 € |
Kreis Warendorf | 3.721,28 € |
Regio Achterhoek | 5.349,35 € |
Partner Provincie Overijssel | 7.101,45 € |
Provincie Overijssel | 17.303,97 € |